Institutional Responsibility and Outreach Activity
Institutional Responsibility
- 1000 kWp capacity Roof top Grid connected Solar Photovoltaic Power Plant at University Campus
- 1 kWp Capacity Solar Photovoltaic Power Plant for Street lighting in front of the Department
- 2.5 kWp Capacity Hybrid Solar Photovoltaic Power Plant for lighting load of Swimming Pool
- 14,500 lpd capacity Solar Hot Water Systems at University Campus
- 50 m3 capacity kitchen waste base Biogas Plant at Patkai Men's Hostel
- Detailed Project Report on Green Campus
- Energy Efficient Lighting Systems (LED ) at University Campus
Outreach
- All members of the department contributed to/joined the TU programme to provide food materials to support needy people during COVID -19 lock down co-ordinated by Prof. D. Deka in May, 2020
- Dr. P. K. Chouhdury volunteered in a flood relief programme of TU to Jhawani village co-ordinated by Prof. D. C. Baruah on 17th July, 2019
- Outreach programmes conducted by Department of Energy under the DST (SEED) sponsored project “RHEES” during 2016-18